Wednesday 30 December 2015

A new LEC is added to an ATM LAN containing other LECs, LES, LECS, a BUS, and a ATM switch. Starting from the initial conditions, six steps are required to make the.doc


WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224


NETWORK MANAGEMENT

The Engineering Department to twelve persons in a small corporation is on a regular 10 Base-T Ethernet Lan hub with 16 ports. The busy group started complaining because of the slow network performance. The network was operating at 50% utilization, whereas 30% utilization is acceptable. If you are the corporation’s Information Technology Engineer and have to resolve the problem technically,

a.  Describe four choices for resolving the problem, maintaining the LAN as an Ethernet LAN.

b. State the advantages and disadvantages of each approach.


1.                    Two virtual LANs, 145.50.50.1 belonging to NM lab, and 145.50.60.1 belonging to Networking lab, each have three workstations. The former has workstations 145.50.50.11-13, and the latter 145.50.60.21.-23. They are connected to a switched hub on ports 2 through 7. the NICs (network interface cards) associated with ports are made by Cabletron and their MAC addresses start with the vendor’s global prefix 00-00-1D (hexadecimal notation) and end with 11,12,13,21,22, and 23 (same as the fourth decimal position of IP addresses).
2.                 

a.   Create a conceptual matrix table, as shown below, that would be 
      generated by the hub that relates the IP address, MAC address,
      and port number.
3.                 


4.                  IP Address
5.                  MAC Address
6.                  Port Number
7.                   
8.                  
9.                   
           
             b.   The workstation 23 is moved from networking lab to NM lab.
                   The appropriate parameter changes in the hub and the workstation.

3.         Design a client/server network with two servers operating at 100Base-T Fast Ethernet speed and the clients operating at regular 10Base-T Ethernet speed using a 10/100 Mbps NIC. The hub is located in a wiring closet, but the servers and clients are not. Assume that a satisfactory performance is achieved at 30% utilization of the LAN.

4.                Customer network management is used to look at the QoS classes associated with VCIs across an ATM link interface. What three MIB group and objects are used to collect the information? Describe the relationships among them.

5.       A new LEC is added to an ATM LAN containing other LECs, LES, LECS, a BUS, and a ATM switch. Starting from the initial conditions, six steps (or phases) are required to make the new LEC part of the ELAN network: (1) LEC connection, (2) configurations, (3) join, (4) initial registration, (5) BUS connection, and (6) operation. Describe these steps.

6.       Switched virtual circuit transmission overhead could be high for sending small amounts of information. Calculate the minimum time required to transmit one ATM cell from Miami to San Francisco on a basic SONET network (OC-3) for the following cases. Assume that the distance is 4500 km and that the propagation speed is 300 meters per microsecond.
                    a.   datagram service
                    b.   switched virtual circuit service
                    c.   permanent virtual circuit service

7.       A network manager discovers that a network component is performing poorly and issues on order to the technician to replace it. Which MIB group contains this information for the technician to find out the physical location of the component?

8.       An IT manager gets complaints from the users that there is excessive delay in response over the Ethernet LAN. The manager suspects the cause of the problem is excessive collisions on the LAN. She gathers statistics on the collisions using the dot3Stats Table and localizes the problem to a single faulty interface card. Explain how she localized the problem. You may use RFC 2358 to answer this exercise.

9.      You have been assigned the responsibility of adding a new vendor’s components with its own NMS to an existing network managed by a different NMS. Identify the three sets of functions that you need to do to fulfill your task.

10.     In a ballroom dance class, the instructor asks the guests to form couples made up of a male and a female order (order does not matter) for a dance. Write an ASN.1 module for dance Group with data type Dance Group that is composed of data type couple; couple is constructed using male and female.

11.     A high school class consists of four boys and four girls. The names of the boys with their heights are Adam (65”), Chang (63”), Eduardo (72”), and Gopal (62”). The names of the girls are Beth (68”), Dipa (59”), Faye (61”), and Keisha (64”). For each of the following cases, write an ASN.1 description for the structure and record values by selecting appropriate data types. Start with data type Student info, listing information on each student.  

12.     You are asked to do a study of the use pattern of 24,000 workstations in an academic institution. Make the following assumptions. You ping each station periodically. The message size in both directions is 128 bytes long. The NMS that you using to do the study is on a 10-Mbps LAN, which functions at 30 percent efficiency. What would be the frequency of your ping if you were not to exceed 5 percent overhead?

13.     Imagine that you are working for a company (maybe you are) that has decided to move from an SNMP-based to a Web-based management system. You are asked to prepare an executive summary on the two approaches, WBEM and JMX, and make a recommendation. Present your report, which is not to exceed two pages (executives don’t have the time or patience to read longer reports).

WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224


A network manager discovers that a network component is performing poorly and issues on order to the technician to replace it.doc


WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224


NETWORK MANAGEMENT

The Engineering Department to twelve persons in a small corporation is on a regular 10 Base-T Ethernet Lan hub with 16 ports. The busy group started complaining because of the slow network performance. The network was operating at 50% utilization, whereas 30% utilization is acceptable. If you are the corporation’s Information Technology Engineer and have to resolve the problem technically,

a.  Describe four choices for resolving the problem, maintaining the LAN as an Ethernet LAN.

b. State the advantages and disadvantages of each approach.


1.                    Two virtual LANs, 145.50.50.1 belonging to NM lab, and 145.50.60.1 belonging to Networking lab, each have three workstations. The former has workstations 145.50.50.11-13, and the latter 145.50.60.21.-23. They are connected to a switched hub on ports 2 through 7. the NICs (network interface cards) associated with ports are made by Cabletron and their MAC addresses start with the vendor’s global prefix 00-00-1D (hexadecimal notation) and end with 11,12,13,21,22, and 23 (same as the fourth decimal position of IP addresses).
2.                 

a.   Create a conceptual matrix table, as shown below, that would be 
      generated by the hub that relates the IP address, MAC address,
      and port number.
3.                 


4.                  IP Address
5.                  MAC Address
6.                  Port Number
7.                   
8.                  
9.                   
           
             b.   The workstation 23 is moved from networking lab to NM lab.
                   The appropriate parameter changes in the hub and the workstation.

3.         Design a client/server network with two servers operating at 100Base-T Fast Ethernet speed and the clients operating at regular 10Base-T Ethernet speed using a 10/100 Mbps NIC. The hub is located in a wiring closet, but the servers and clients are not. Assume that a satisfactory performance is achieved at 30% utilization of the LAN.

4.                Customer network management is used to look at the QoS classes associated with VCIs across an ATM link interface. What three MIB group and objects are used to collect the information? Describe the relationships among them.

5.       A new LEC is added to an ATM LAN containing other LECs, LES, LECS, a BUS, and a ATM switch. Starting from the initial conditions, six steps (or phases) are required to make the new LEC part of the ELAN network: (1) LEC connection, (2) configurations, (3) join, (4) initial registration, (5) BUS connection, and (6) operation. Describe these steps.

6.       Switched virtual circuit transmission overhead could be high for sending small amounts of information. Calculate the minimum time required to transmit one ATM cell from Miami to San Francisco on a basic SONET network (OC-3) for the following cases. Assume that the distance is 4500 km and that the propagation speed is 300 meters per microsecond.
                    a.   datagram service
                    b.   switched virtual circuit service
                    c.   permanent virtual circuit service

7.       A network manager discovers that a network component is performing poorly and issues on order to the technician to replace it. Which MIB group contains this information for the technician to find out the physical location of the component?

8.       An IT manager gets complaints from the users that there is excessive delay in response over the Ethernet LAN. The manager suspects the cause of the problem is excessive collisions on the LAN. She gathers statistics on the collisions using the dot3Stats Table and localizes the problem to a single faulty interface card. Explain how she localized the problem. You may use RFC 2358 to answer this exercise.

9.      You have been assigned the responsibility of adding a new vendor’s components with its own NMS to an existing network managed by a different NMS. Identify the three sets of functions that you need to do to fulfill your task.

10.     In a ballroom dance class, the instructor asks the guests to form couples made up of a male and a female order (order does not matter) for a dance. Write an ASN.1 module for dance Group with data type Dance Group that is composed of data type couple; couple is constructed using male and female.

11.     A high school class consists of four boys and four girls. The names of the boys with their heights are Adam (65”), Chang (63”), Eduardo (72”), and Gopal (62”). The names of the girls are Beth (68”), Dipa (59”), Faye (61”), and Keisha (64”). For each of the following cases, write an ASN.1 description for the structure and record values by selecting appropriate data types. Start with data type Student info, listing information on each student.  

12.     You are asked to do a study of the use pattern of 24,000 workstations in an academic institution. Make the following assumptions. You ping each station periodically. The message size in both directions is 128 bytes long. The NMS that you using to do the study is on a 10-Mbps LAN, which functions at 30 percent efficiency. What would be the frequency of your ping if you were not to exceed 5 percent overhead?

13.     Imagine that you are working for a company (maybe you are) that has decided to move from an SNMP-based to a Web-based management system. You are asked to prepare an executive summary on the two approaches, WBEM and JMX, and make a recommendation. Present your report, which is not to exceed two pages (executives don’t have the time or patience to read longer reports).

WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224


A multi-purpose river valley project across a major river is planned for construction. Irrigation power development fisheries and picnic development are all planned.doc


WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224


CONSTRUCTION MANAGEMENT


1.       What a note on tender and tender notices
2.      Discuss the different types of tenders?
3.      Write a note on EMD and SD.
4.      What are the procedures followed after the opening of a tender?
5.      Explain the importance of organization in construction activities
6.      Enumerate the general principles to be followed in forming an organization system.
7.      A multi-purpose river valley project across a major river is planned for construction. Irrigation, power development, fisheries and picnic development are all planned. Suggest a suitable organization structure for construction and maintenance of this project.


Construction Management

Q1) what do you understand by Arbitration? What are the useful of Arbitration?
Q2) List the special rules that have to be followed while constructing.
Q3) Write a note on role of a Civil Engineer while planning and constructing a building.
Q4) what do you understand by economic life of equipment? Also differentiate between economic life and useful life?
Q5) which are the two main types of contracts? Explain them and list at least three sub types under each of them?
Q6) what are important stages in Construction?
Q7) Explain Safety measures to be adopted during drilling and blasting works?
Q8) Explain the objects and function of Construction Management?
Q9) Describe in Details various steps involved in construction planning?
Q10) Explain the types of scheduling techniques?


CONSTRUCTION MANAGEMENT


1. What do you understand by “investment appraisal”? Explain the following methods of project appraisal. What do you understand by “cash flow forecasting”?. What neat sketches, explain the uses of S – curve.
                                                                                       
(i)                Return – on capital employed
(ii)             Pay back method
(iii)           Discount cash flow method

2. A company is engaged in producing a spare part which is sold at an uniform price of Rs. 100 each. The variable cost of producing the spare part amounts to Rs. 60 per unit while the fixed costs amount to Rs. 250000. How many spare parts must be produced and sold so that company breaks even? How much sales would be made at this level of activity, if the firm desires a profit of Rs. 150000.

3. Define TQM. Explain its various elements. Discuss the application of TQM in the construction industry.

4. What do you understand by “break even analysis” and explain its salient features and limitations.


WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS

ARAVIND - 09901366442 – 09902787224

A manufacturing company operating a system of budgetary control finds that their production capacity during the year varies between 75 per cent and 90 per cent.doc

WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224


Cost And Management Accounting

  1. “Management accounting is a mid-way between financial and cost accounting.” Elucidate.

  1. What is the major revenue recognition criterion?


  1. What is a trading account? What are its major constituents? What is its major outcome?


  1. The cash flow statement is as useful to shareholders and lenders as to management. Explain.


  1. (a) “All future costs are relevant.” Do you agree? Why?
(b) “Fixed costs are really variable. The more you produce the less they become.”                                  
                    Do you agree? Explain.

  1. In connection with inventory ordering and control, certain terms are basic. Explain the meaning of each of the following:
    1. Economic order quantity
    2. Re-order point
    3. Lead time
    4. Safety stock
    
  1. What is meant by under/over-absorption of factory overheads? How will you account for them in cost accounts? Does it bear any impact while submitting quotations?


  1. A manufacturing company operating a system of budgetary control finds that their production capacity during the year varies between 75 per cent and 90 per cent as against the budgeted capacity of 80 per cent for the year. It has been suggested that a system budgets should be introduced to effectively control costs. Outline the steps you would take to implement this suggestion keeping in mind that the management would still require periodic comparison with their overall budget during the year.


  1. “Transfer prices must always be equal to externally determined market of comparative products or services.” Comment fully.


  1.  Suppose a firm is considering replacing an old machine with a new one. The firm does not anticipate that any new revenues will be created by the replacement since demand for the product generation by both the machines is the same. However, in the CFAT work sheet used in evaluating the proposal, the analyst shows positive CFBT in the operating cash flow section. What creates operating CFBT in this situation?


WE PROVIDE CASE STUDY ANSWERS, ASSIGNMENT SOLUTIONS, PROJECT REPORTS AND THESIS
ARAVIND - 09901366442 – 09902787224